Environmental Impact Statement
A draft environmental impact statement describing impacts and benefits of the Queensland Curtis LNG Project was formally lodged with government in late August 2009. The document received 40 submissions from government agencies, interest groups and individuals during a seven-week public exhibition.
A supplementary environmental impact statement was prepared to respond to public submissions received on the draft environmental impact statement and to inform stakeholders of material changes in project design, impacts and benefits.
The supplementary environment impact statement and the draft environmental impact statement constitute the final environmental impact assessment for the Queensland Curtis LNG Project, and should be read in conjunction.
The supplementary environmental impact statement is divided into volumes addressing distinct project components or specific areas of interest. Chapters of the supplementary are paired with their corresponding documents in the draft environmental impact statement.
Stakeholders can view where their submissions are addressed in the full list of submissions on the Draft EIS.
Click on the links below to download individual chapters. Visitors with slower internet connections can visit a version of the Draft & Sup EIS where file sizes are a maximum 2 megabytes.
VOLUMES AND ANNEXES
- Preface
- Supplementary Preface
- Supplementary full list of submissions on the Draft EIS
- Table of Contents
Executive Summary
Volume 1: EIS Process Overview
- Table of Contents
- Supplementary Table of Contents
- Chapter 1: Introduction
- Chapter 1: Supplementary Introduction
- Chapter 2: Project Overview
- Chapter 2: Supplementary Project Overview
- Chapter 3: EIS Process and Methodology
- Chapter 3: Supplementary EIS Process and Methodology
- Chapter 4: Stakeholder Consultation Process
- Chapter 4: Supplementary Stakeholder Consultation Process
- Chapter 5: Project Approvals and Legislative Framework
- Chapter 5: Supplementary Project Approvals and Legislative Framework
- Chapter 6: Accredited Process for Controlled Actions Under Commonwealth Legislation
- Chapter 6: Supplementary Accredited Process for Controlled Actions Under Commonwealth Legislation
- Annex 1.1: Bibliography
Volume 2: Project Description
- Table of Contents
- Supplementary Table of Contents
- Chapter 1: Introduction
- Chapter 1: Supplementary Introduction
- Chapter 2: Introducing the EIS Reference Case
- Chapter 2: Supplementary Introducing the EIS Reference Case
- Chapter 3: Summary of Project Components
- Chapter 3: Supplementary Summary of Project Components
Chapter 4: Location of Project Components
- Chapter 4: Location of Project Components Part 01
- Chapter 4: Location of Project Components Part 02
- Chapter 4: Location of Project Components Part 03
- Chapter 4: Location of Project Components Part 04
- Chapter 4: Location of Project Components Part 05
- Chapter 4: Location of Project Components Part 06
- Chapter 4: Location of Project Components Part 07
- Chapter 4: Location of Project Components Part 08
- Chapter 4: Supplementary Location of Project Components
- Chapter 5: Project Timing and Schedule
- Chapter 5: Supplementary Project Timing and Schedule
- Chapter 6: Workforce
- Chapter 6: Supplementary Workforce
- Chapter 7: Gas Field Component Operations
- Chapter 7: Supplementary Gas Field Component Operations
- Chapter 8: Pipeline Operations
- Chapter 8: Supplementary Pipeline Operations
Chapter 9: LNG Component Operations
- Chapter 10: Swing Basin and Shipping Channel Operations
- Chapter 10: Supplementary Marine Facilities Operations
- Chapter 11: Gas Field Construction
- Chapter 11: Supplementary Gas Field Construction
Chapter 12: Pipeline Construction
Chapter 13: LNG Component Construction
- Chapter 14: Swing Basin and Shipping Channel Construction
- Chapter 14: Supplementary Marine Facilities Construction
- Chapter 15: Gas Field Component Rehabilitation and Decommissioning
- Chapter 15: Supplementary Gas Field Component Rehabilitation and Decommissioning
- Chapter 16: Pipeline Rehabilitation and Decommissioning
- Chapter 16: Supplementary Pipeline Rehabilitation and Decommissioning
- Chapter 17: LNG Facility Rehabilitation and Decommissioning
- Chapter 17: Supplementary LNG Facility Rehabilitation and Decommissioning
Volume 3: Environmental Assessment of Gas Field Component
- Table of Contents
- Supplementary Table of Contents
- Chapter 1: Introduction
- Chapter 1: Supplementary Introduction
- Chapter 2: Climate and Climate Change
- Chapter 2: Supplementary Climate and Climate Change
- Chapter 3: Topography and Geomorphology
- Chapter 3: Supplementary Topography and Geomorphology
Chapter 4: Geology and Soils
Chapter 5: Land Use and Infrastructure
- Chapter 5: Land Use and Infrastructure Part 01
- Chapter 5: Land Use and Infrastructure Part 02
- Chapter 5: Land Use and Infrastructure Part 03
- Chapter 5: Land Use and Infrastructure Part 04
- Chapter 5: Land Use and Infrastructure Part 05
- Chapter 5: Land Use and Infrastructure Part 06
- Chapter 5: Supplementary Land Use and Infrastructure
- Chapter 6: Land Contamination
- Chapter 6: Supplementary Land Contamination
Chapter 7: Terrestrial Ecology
- Chapter 8: Aquatic (Freshwater) Ecology
- Chapter 8: Supplementary Aquatic (Freshwater) Ecology
- Chapter 9: Surface Water
- Chapter 9: Supplementary Surface Water
- Chapter 10: Groundwater
- Chapter 10: Supplementary Groundwater
- Chapter 11: Associated Water Management
- Chapter 11: Supplementary Associated Water Management
Chapter 12: Air Quality
- Chapter 13: Noise and Vibration
- Chapter 13: Supplementary Noise and Vibration
- Chapter 14: Transport
- Chapter 14: Supplementary Transport
- Chapter 15: Visual Amenity
- Chapter 15: Supplementary Visual Amenity
- Chapter 16: Waste Management
- Chapter 16: Supplementary Waste Management
- Chapter 17: Hazard and Risk
- Chapter 17: Supplementary Hazard and Risk
- Chapter 18: Summary of Cumulative Environmental Impacts
- Chapter 18: Supplementary Summary of Cumulative Environmental Impacts
- Chapter 19: Key Findings and Conclusion
- Chapter 19: Supplementary Construction Plan to 2014
Volume 4: Environmental Assessment of Pipeline Component
- Table of Contents
- Supplementary Table of Contents
- Chapter 1: Introduction
- Chapter 1: Supplementary Introduction
- Chapter 2: Climate and Climate Change
- Chapter 2: Supplementary Climate and Climate Change
- Chapter 3: Topography and Geomorphology
- Chapter 3: Supplementary Topography and Geomorphology
Chapter 4: Geology and Soils
Chapter 5: Land Use and Infrastructure
- Chapter 6: Land Contamination
- Chapter 6: Supplementary Land Contamination
Chapter 7: Terrestrial Ecology
- Chapter 7: Terrestrial Ecology Part 01
- Chapter 7: Terrestrial Ecology Part 02
- Chapter 7: Terrestrial Ecology Part 03
- Chapter 7: Terrestrial Ecology Part 04
- Chapter 7: Terrestrial Ecology Part 05
- Chapter 7: Terrestrial Ecology Part 06
- Chapter 7: Terrestrial Ecology Part 07
- Chapter 7: Terrestrial Ecology Part 08
- Chapter 7: Supplementary Terrestrial Ecology
- Chapter 8: Aquatic Ecology
- Chapter 8: Supplementary Aquatic Ecology
- Chapter 9: Surface Water
- Chapter 9: Supplementary Surface Water
- Chapter 10: Groundwater
- Chapter 10: Supplementary Groundwater
- Chapter 11: Air Quality
- Chapter 11: Supplementary Air Quality
- Chapter 12: Noise and Vibration
- Chapter 12: Supplementary Noise and Vibration
- Chapter 13: Transport
- Chapter 13: Supplementary Transport
- Chapter 14: Visual Amenity
- Chapter 14: Supplementary Visual Amenity
- Chapter 15: Waste Management
- Chapter 15: Supplementary Waste Management
- Chapter 16: Hazard and Risk
- Chapter 16: Supplementary Hazard and Risk
- Chapter 17: Summary of Cumulative Environmental Impacts
- Chapter 17: Supplementary Summary of Cumulative Environmental Impacts
- Chapter 18: Key Findings and Conclusion
Volume 5: Environmental Assessment of LNG Component
- Table of Contents
- Supplementary Table of Contents
- Chapter 1: Introduction
- Chapter 1: Supplementary Introduction
- Chapter 2: Climate and Climate Change
- Chapter 2: Supplementary Climate and Climate Change
- Chapter 3: Topography and Geomorphology
- Chapter 3: Supplementary Topography and Geomorphology
Chapter 4: Geology and Soils
- Chapter 4: Geology and Soils Part 01
- Chapter 4: Geology and Soils Part 02
- Chapter 4: Geology and Soils Part 03
- Chapter 4: Geology and Soils Part 04
- Chapter 4: Geology and Soils Part 05
- Chapter 4: Geology and Soils Part 06
- Chapter 4: Geology and Soils Part 07
- Chapter 4: Geology and Soils Part 08
- Chapter 4: Geology and Soils Part 09
- Chapter 4: Supplementary Geology and Soils
Chapter 5: Land Use and Infrastructure
- Chapter 6: Land Contamination
- Chapter 6: Supplementary Land Contamination
- Chapter 7: Terrestrial Ecology
- Chapter 7: Supplementary Terrestrial Ecology
- Chapter 8: Marine Ecology
- Chapter 8: Supplementary Marine Ecology
- Chapter 9: Surface Water
- Chapter 9: Supplementary Surface Water
- Chapter 10: Groundwater
- Chapter 10: Supplementary Groundwater
Chapter 11: Coastal Environment
Chapter 12: Air Quality
Chapter 13: Noise and Vibration
- Chapter 14: Road, Rail, Air and Public Transport
- Chapter 14: Supplementary Road, Rail, Air and Public Transport
Chapter 15: Shipping Transport
Chapter 16: Visual Amenity
- Chapter 17: Waste Management
- Chapter 17: Supplementary Waste Management
- Chapter 18: Hazard and Risk
- Chapter 18: Supplementary Hazard and Risk
- Chapter 19: Summary of Cumulative Environmental Impacts
- Chapter 20: Key Findings and Conclusion
- Annex 5.1: Climate Change Projections
- Annex 5.2: Likelihood of Threatened Species occurring within the study area
- Annex 5.3: EPBC Act Protected Matters Report
- Annex 5.4: Groundwater Database Bore Card Reports
- Annex 5.5: Legislation, Codes of Practice and Standards Applicable to Health and Safety Management
- Annex 5.6: Draft Construction HAZID Word Diagram
Volume 6: Environmental Assessment for Dredging Aspects
- Table of Contents
- Supplementary Table of Contents
- Volume 6: Environmental Assessment of Swing Basin and Shipping Channel Construction Part 01
- Volume 6: Environmental Assessment of Swing Basin and Shipping Channel Construction Part 02
- Volume 6: Environmental Assessment of Swing Basin and Shipping Channel Construction Part 03
- Volume 6: Supplementary Environmental Assessment for Dredging for Marine Facilities
Volume 7: Greenhouse Gas Management
Volume 8: Social, Cultural and Economic Impact Assessment
- Table of Contents
- Supplementary Table of Contents
- Chapters 1, 2 & 3: Scope of Assessment, Study Area, Methodology
- Chapters 1, 2 & 3: Supplementary Scope of Assessment, Study Area, Methodology
Chapter 4: Social Impact Assessment for Gas Field – Western Downs Region Communities
Chapter 5: Social Impact Assessment for Pipeline – Banana Region Communities
- Chapter 5: Social Impact Assessment for Pipeline – Banana Region Communities Part 01
- Chapter 5: Social Impact Assessment for Pipeline – Banana Region Communities Part 02
- Chapter 5: Social Impact Assessment for Pipeline – Banana Region Communities Part 03
- Chapter 5: Social Impact Assessment for Pipeline – Banana Region Communities Part 04
- Chapter 5: Supplementary Social Impact Assessment for Pipeline – Banana Region Communities
- Chapter 6: Social Impact Assessment for LNG Facility – Gladstone Region Communities
- Chapter 6: Supplementary Social Impact Assessment for LNG Facility – Gladstone Region Communities
- Chapter 7: Social Impact Assessment for Indigenous Communities
- Chapter 7: Supplementary Social Impact Assessment for Indigenous Communities
- Chapter 8: Social Impact Mitigations and Management for the Queensland Curtis LNG Project Area
- Chapter 8: Supplementary Social Impact Mitigations and Management for the Queensland Curtis LNG Project Area
Chapter 9: Cultural Heritage Impact Assessment
- Chapter 9: Cultural Heritage Impact Assessment Part 01
- Chapter 9: Cultural Heritage Impact Assessment Part 02
- Chapter 9: Cultural Heritage Impact Assessment Part 03
- Chapter 9: Cultural Heritage Impact Assessment Part 04
- Chapter 9: Cultural Heritage Impact Assessment Part 05
- Chapter 9: Cultural Heritage Impact Assessment Part 06
- Chapter 9: Cultural Heritage Impact Assessment Part 07
- Chapter 9: Supplementary Cultural Heritage Impact Assessment
Volume 9: Gas Field Component Environmental Management Plan
Volume 10: Pipeline Component Environmental Management Plan
Volume 11: LNG Component Environmental Management Plan
Volume 12: Stakeholder Consultation
Volume 13: EPBC Assessment Report
APPENDICES
- Table of Contents
- Appendix 1.1: Final Terms of Reference May 2009
- Appendix 1.2: Cross-Reference with Terms of Reference
- Appendix 1.3: Applicable Legislation and Interpretation
- Appendix 1.4: QCLNG Project EIS Study Team
- Appendix 1.5: Proponent Commitments
Appendix 1.6: Projects Considered in the Assessment of Cumulative Impacts
Appendix 3.1: Gas Field – Soils Study
- Appendix 3.1: Gas Field – Soils Study Part 01
- Appendix 3.1: Gas Field – Soils Study Part 02
- Appendix 3.1: Gas Field – Soils Study Part 03
- Appendix 3.1: Gas Field – Soils Study Part 04
- Appendix 3.1: Gas Field – Soils Study Part 05
- Appendix 3.1: Gas Field – Soils Study Part 06
- Appendix 3.1: Gas Field – Soils Study Part 07
- Appendix 3.1: Gas Field – Soils Study Part 08
- Appendix 3.1: Gas Field – Soils Study Part 09
- Appendix 3.1: Gas Field – Soils Study Part 10
- Appendix 3.1: Gas Field – Soils Study Part 11
- Appendix 3.1: Gas Field – Soils Study Part 12
- Appendix 3.1: Gas Field – Soils Study Part 13
- Appendix 3.1: Gas Field – Soils Study Part 14
- Appendix 3.1: Gas Field – Soils Study Part 15
- Appendix 3.1: Gas Field – Soils Study Part 16
Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 01
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 02
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 03
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 04
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 05
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 06
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 07
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 08
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 09
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 10
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 11
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 12
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 13
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 14
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 15
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 16
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 17
- Appendix 3.2: Gas Field – Terrestrial and Freshwater Flora and Fauna Assessment Part 18
Appendix 3.3: Gas Field – Surface Water Report
- Appendix 3.3: Gas Field – Surface Water Report Part 01
- Appendix 3.3: Gas Field – Surface Water Report Part 02
- Appendix 3.3: Gas Field – Surface Water Report Part 03
- Appendix 3.3: Gas Field – Surface Water Report Part 04
- Appendix 3.3: Gas Field – Surface Water Report Part 05
- Appendix 3.3: Gas Field – Surface Water Report Part 06
- Appendix 3.3: Gas Field – Surface Water Report Part 07
- Appendix 3.3: Gas Field – Surface Water Report Part 08
Appendix 3.4: Gas Field – Groundwater Report
- Appendix 3.4: Gas Field – Groundwater Report Part 01
- Appendix 3.4: Gas Field – Groundwater Report Part 02
- Appendix 3.4: Gas Field – Groundwater Report Part 03
- Appendix 3.4: Gas Field – Groundwater Report Part 04
- Appendix 3.4: Gas Field – Groundwater Report Part 05
- Appendix 3.4: Gas Field – Groundwater Report Part 06
- Appendix 3.4: Gas Field – Groundwater Report Part 07
- Appendix 3.4: Gas Field – Groundwater Report Part 08
- Appendix 3.4: Gas Field – Groundwater Report Part 09
- Appendix 3.4: Gas Field – Groundwater Report Part 10
- Appendix 3.4: Gas Field – Groundwater Report Part 11
- Appendix 3.4: Gas Field – Groundwater Report Part 12
- Appendix 3.4: Gas Field – Groundwater Report Part 13
Appendix 3.5: Gas Field and Pipeline – Air Quality Impact Assessment
- Appendix 3.6: Gas Field and Pipeline – Noise Impact Assessment
Appendix 3.7: Gas Field – Transport Assessment
Appendix 3.8: Gas Field – Landscape and Visual Assessment
- Appendix 3.8: Gas Field – Landscape and Visual Assessment Part 01
- Appendix 3.8: Gas Field – Landscape and Visual Assessment Part 02
- Appendix 3.8: Gas Field – Landscape and Visual Assessment Part 03
- Appendix 3.8: Gas Field – Landscape and Visual Assessment Part 04
- Appendix 3.8: Gas Field – Landscape and Visual Assessment Part 05
- Appendix 3.8: Gas Field – Landscape and Visual Assessment Part 06
- Appendix 3.9: Gas Field – Preliminary Hazard Analysis
Appendix 3.10: Gas Field – Dangerous Goods Assessment
Appendix 4.1: Pipeline – Soil and Water Assessment
Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 01
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 02
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 03
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 04
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 05
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 06
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 07
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 08
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 09
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 10
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 11
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 12
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 13
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 14
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 15
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 16
- Appendix 4.2: Pipeline – Terrestrial and Freshwater Flora and Fauna Assessment Part 17
- Appendix 4.3: Pipeline – Noise and Vibration Impact Assessment
Appendix 4.4: Pipeline – Transport Assessment
Appendix 4.5: Pipeline – Landscape and Visual Assessment
- Appendix 4.5: Pipeline – Landscape and Visual Assessment Part 01
- Appendix 4.5: Pipeline – Landscape and Visual Assessment Part 02
- Appendix 4.5: Pipeline – Landscape and Visual Assessment Part 03
- Appendix 4.5: Pipeline – Landscape and Visual Assessment Part 04
- Appendix 4.5: Pipeline – Landscape and Visual Assessment Part 05
- Appendix 4.5: Pipeline – Landscape and Visual Assessment Part 06
- Appendix 5.1: LNG Facility – Geology and Soils Assessment
Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 01
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 02
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 03
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 04
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 05
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 06
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 07
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 08
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 09
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 10
- Appendix 5.2: LNG Facility – Acid Sulfate Soils Investigation Part 11
- Appendix 5.3: LNG Facility – Infrastructure Audit
- Appendix 5.4: LNG Facility – Phase I and II Site Assessment
Appendix 5.5: LNG Facility – Flora Report Part
- Appendix 5.5: LNG Facility – Flora Report Part 01
- Appendix 5.5: LNG Facility – Flora Report Part 02
- Appendix 5.5: LNG Facility – Flora Report Part 03
- Appendix 5.5: LNG Facility – Flora Report Part 04
- Appendix 5.5: LNG Facility – Flora Report Part 05
- Appendix 5.5: LNG Facility – Flora Report Part 06
- Appendix 5.5: LNG Facility – Flora Report Part 07
- Appendix 5.6: LNG Facility – Reptiles and Amphibians Report
Appendix 5.7: LNG Facility – Targeted Bird Survey
- Appendix 5.7: LNG Facility – Targeted Bird Survey Part 01
- Appendix 5.7: LNG Facility – Targeted Bird Survey Part 02
- Appendix 5.7: LNG Facility – Targeted Bird Survey Part 03
- Appendix 5.7: LNG Facility – Targeted Bird Survey Part 04
- Appendix 5.7: LNG Facility – Targeted Bird Survey Part 05
- Appendix 5.7: LNG Facility – Targeted Bird Survey Part 06
Appendix 5.8: LNG Facility – Supplementary Targeted Bird Survey
Appendix 5.9: LNG Facility – Marine Water Quality Assessment
- Appendix 5.9: LNG Facility – Marine Water Quality Assessment Part 01
- Appendix 5.9: LNG Facility – Marine Water Quality Assessment Part 02
- Appendix 5.9: LNG Facility – Marine Water Quality Assessment Part 03
- Appendix 5.9: LNG Facility – Marine Water Quality Assessment Part 04
- Appendix 5.9: LNG Facility – Marine Water Quality Assessment Part 05
- Appendix 5.9: LNG Facility – Marine Water Quality Assessment Part 06
- Appendix 5.9: LNG Facility – Marine Water Quality Assessment Part 07
- Appendix 5.9: LNG Facility – Marine Water Quality Assessment Part 08
- Appendix 5.10: LNG Facility – Coastal Process and Modelling Report
- Appendix 5.11: LNG Facility – Hydrodynamic Assessment
- Appendix 5.12: LNG Facility – Coastal Legislation and Policy
Appendix 5.13: LNG Facility – Air Quality Impact Assessment
- Appendix 5.13: LNG Facility – Air Quality Impact Assessment Part 01
- Appendix 5.13: LNG Facility – Air Quality Impact Assessment Part 02
- Appendix 5.13: LNG Facility – Air Quality Impact Assessment Part 03
- Appendix 5.13: LNG Facility – Air Quality Impact Assessment Part 04
- Appendix 5.13: LNG Facility – Air Quality Impact Assessment Part 05
- Appendix 5.13: LNG Facility – Air Quality Impact Assessment Part 06
- Appendix 5.13: LNG Facility – Air Quality Impact Assessment Part 07
Appendix 5.14: LNG Facility – Noise and Vibration Impact Assessment
- Appendix 5.14: LNG Facility – Noise and Vibration Impact Assessment Part 01
- Appendix 5.14: LNG Facility – Noise and Vibration Impact Assessment Part 02
- Appendix 5.14: LNG Facility – Noise and Vibration Impact Assessment Part 03
- Appendix 5.14: LNG Facility – Noise and Vibration Impact Assessment Part 04
Appendix 5.15: LNG Facility – Traffic and Transport Impact Assessment
- Appendix 5.15: LNG Facility – Traffic and Transport Impact Assessment Part 01
- Appendix 5.15: LNG Facility – Traffic and Transport Impact Assessment Part 02
- Appendix 5.15: LNG Facility – Traffic and Transport Impact Assessment Part 03
- Appendix 5.15: LNG Facility – Traffic and Transport Impact Assessment Part 04
- Appendix 5.16: LNG Facility – Microsimulation Assessment
Appendix 5.17: LNG Facility – Gladstone Intersection Upgrade Concept Designs
- Appendix 5.17: LNG Facility – Gladstone Intersection Upgrade Concept Designs Part 01
- Appendix 5.17: LNG Facility – Gladstone Intersection Upgrade Concept Designs Part 02
- Appendix 5.17: LNG Facility – Gladstone Intersection Upgrade Concept Designs Part 03
- Appendix 5.17: LNG Facility – Gladstone Intersection Upgrade Concept Designs Part 04
- Appendix 5.17: LNG Facility – Gladstone Intersection Upgrade Concept Designs Part 05
- Appendix 5.17: LNG Facility – Gladstone Intersection Upgrade Concept Designs Part 06
Appendix 5.18: LNG Facility – Landscape and Visual Assessment
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 01
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 02
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 03
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 04
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 05
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 06
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 07
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 08
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 09
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 10
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 11
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 12
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 13
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 14
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 15
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 16
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 17
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 18
- Appendix 5.18: LNG Facility – Landscape and Visual Assessment Part 19
SUPPLEMENTARY APPENDICES
- Appendix 1.1: Bibliography
- Appendix 2.1: A full list of submissions on the Draft EIS (summary)
- Appendix 2.2: Project Acid Sulfate Soils (ASS) management framework
- Appendix 2.3: Draft Vegetation and Biodiversity Offset Strategy
- Appendix 2.4: Workforce Accommodation on Curtis Island
- Appendix 3.1: Supplementary Flora and Fauna Assessment
- Appendix 3.2: Groundwater Study - Northwest Development Area
- Appendix 3.3: Air Emissions Report
- Appendix 3.4: Supplementary Environmental Noise Level Impact Assessment
- Appendix 3.5: Road Impact Assessment Report
- Appendix 3.6: Supplementary Landscape and Visual Impact Assessment
- Appendix 4.1: Supplementary Flora and Fauna Assessment
- Appendix 5.1: Geology, Geomorphology, Topography and Soils Report
- Appendix 5.2: Supplementary Surveys for Powerful Owl and Migratory Shorebirds
- Appendix 5.3: Gladstone Channel Underwater Noise Assessment
- Appendix 5.4: Hydrodynamics and Coastal Processes Report
- Appendix 5.5: Maritime Harbour Movements of Port Curtis 2009
- Appendix 5.6: Port Curtis Reef Assessment
- Appendix 5.7: Supplementary Noise and Vibration Impact Assessment
- Appendix 5.8: Supplementary Traffic and Transport Impact Assessment
- Appendix 5.9: Supplementary Landscape and Visual Impact Assessment
- Appendix 6.1: Draft Dredge Management Plan
- Appendix 6.2: Early Works Dredge Plume Modelling
- Appendix 6.3: Pipeline Burial Sediment Plume Modelling
- Appendix 8.1: North Burnett Community Profile
- Appendix 8.2: Cultural Heritage Supplementary Assessment
- Appendix 8.3: Code of Conduct
- Appendix 8.4: Draft Social Impact Management Plan
- Appendix 11.1: Vegetation Clearing Strategy
- Appendix 11.2: Weed and Pest Management Plan
- Appendix 11.3: Spoil Rehabilitation and Revegetation Plan
- Appendix 12.1: Draft EIS Public Advertising Material
ADDENDUM TO SUPPLEMENTARY EIS
To open PDF files on this site you will require the free Adobe Reader.
